Eliminate Liability.
Accelerate Construction.
A tailored proposal for Baker Construction. Boldwater's patented, rapid in-situ bioremediation technology eliminates hydrocarbon spills, transforms contaminated commercial sites, and cuts disposal costs by over 80%—keeping your heavy equipment moving and your projects on schedule.
Why Boldwater?
The remediation solution that pays for itself.
Success Rate
Regulatory approved, 100% successful history of rapidly cleaning up hydrocarbon contamination across industries.
Cost Savings
Typical savings achieved by eliminating heavy-haul trucking, landfill disposal fees, and replacement backfill.
Ongoing Liability
Material is rapidly returned to natural state or recycled to TxDOT base, completely breaking the chain-of-liability.
Offsite Transport
True in-situ/on-site remediation. No hazardous waste hauling, keeping your job sites clear and logistics simple.
Custom Solutions for Baker Construction
From accidental equipment spills to complex brownfield development, Boldwater’s bio-technologies integrate seamlessly into active construction environments without causing project delays.
Rapid Response: Equipment Spills
Heavy earthmoving equipment, generators, and fuel storage frequently result in localized diesel, hydraulic fluid, and oil spills on active Baker construction sites. Traditional response involves halting work, excavating the soil, manifesting it as hazardous waste, and trucking it away.
-
✔️
The Boldwater Fix: Our "Spill Eliminator" microbial packs can be deployed immediately on-site.
-
✔️
Zero Downtime: Treat the spill in-place. Light hydrocarbons are decomposed in hours.
-
✔️
Cost Avoidance: Avoid emergency hazmat hauling fees and eliminate reportable liability.
Site Development & Brownfield Prep
When Baker Construction takes on commercial development projects on previously industrialized land (gas stations, old factories, oilfields), legacy hydrocarbon contamination can halt ground-breaking and destroy budgets.
-
✔️
In-Situ Treatment: We remediate contaminated soils in place, or in temporary onsite berms, working alongside your earthwork crews.
-
✔️
EPA & State Compliant: Our natural surfactant and BiOWiSH microbes rapidly break down TPH (Total Petroleum Hydrocarbons) to well below regulatory closure limits.
-
✔️
Retain Your Dirt: Once clean, the soil remains on your site to be used as structural fill, completely avoiding "dig and haul" replacement costs.
Circular Economy: TxDOT Grade Materials
Boldwater isn't just a remediation company; we are an EPA and Texas RRC permitted recycler (Permit MR-0024). We turn oilfield and industrial waste into high-strength engineering assets.
-
✔️
Certified Road Base: Our remediated materials routinely exceed TxDOT Grade 2 flexible base specifications and compressive strength (≥ 35 psi).
-
✔️
Ready for Use: Pre-approved for county roads, drill pads, equipment pads, and commercial subgrades.
-
✔️
Supply Chain Edge: Partnering with Boldwater gives Baker access to a localized, highly sustainable, and cost-effective source of engineered base material.
The Boldwater Bio-Remediation Process
Our patented, EPA-recognized technology utilizes specialized all-natural, non-GMO microbiology (powered by BiOWiSH®) to literally consume and safely eliminate hydrocarbons. No hazardous byproducts. No VOCs. Just clean dirt.
1. Contamination
Hydrocarbon spill, leak, or existing brownfield soil is identified on site.
2. Bio-Application
Boldwater's proprietary microbe & nutrient blend is applied directly to the soil.
3. Aerobic Curing
Mechanical mixing aerates the soil. Microbes rapidly consume the hydrocarbons.
4. Clean Asset
TPH drops to safe levels. Soil is clean, liability is gone, ready for reuse or backfill.
The Financial Edge:
Proof in the Data
In a recent commercial-scale 13,965 cubic-yard remediation project, our process was benchmarked against the traditional construction approach (Dig, Haul to Landfill, and Replace with new dirt).
Because Boldwater treats the soil in-place and converts it into reusable material, we eliminated over $1.2 Million in trucking, disposal, and replacement costs. The net result was an 82.8% total cost reduction, alongside the complete elimination of long-term environmental liability.
Project Financial Summary
- Traditional Haul & Dispose Est: $1,219,775
- Boldwater Total Net Cost: $209,643
- Total Savings for Client: $1,010,132
Cost Comparison: Traditional vs. Boldwater
Let's Build The Future, Cleanly.
Baker Construction requires fast, compliant, and cost-effective solutions. Boldwater USA has the technology, the permits, and the field experience to deliver. Let's discuss a partnership.
Mark Knippa
President & CEO, Boldwater USA
Phone
(866) 617-4410Headquarters
11810 Cypress N. Houston Rd, Suite E
Cypress, TX 77429