Boldwater Solutions for Baker Construction
Strategic Partnership Proposal

Eliminate Liability.
Accelerate Construction.

A tailored proposal for Baker Construction. Boldwater's patented, rapid in-situ bioremediation technology eliminates hydrocarbon spills, transforms contaminated commercial sites, and cuts disposal costs by over 80%—keeping your heavy equipment moving and your projects on schedule.

Why Boldwater?

The remediation solution that pays for itself.

🏆
0%

Success Rate

Regulatory approved, 100% successful history of rapidly cleaning up hydrocarbon contamination across industries.

💰
> 0%

Cost Savings

Typical savings achieved by eliminating heavy-haul trucking, landfill disposal fees, and replacement backfill.

🛡️
100

Ongoing Liability

Material is rapidly returned to natural state or recycled to TxDOT base, completely breaking the chain-of-liability.

🚚
100

Offsite Transport

True in-situ/on-site remediation. No hazardous waste hauling, keeping your job sites clear and logistics simple.

Custom Solutions for Baker Construction

From accidental equipment spills to complex brownfield development, Boldwater’s bio-technologies integrate seamlessly into active construction environments without causing project delays.

🚜

Rapid Response: Equipment Spills

Heavy earthmoving equipment, generators, and fuel storage frequently result in localized diesel, hydraulic fluid, and oil spills on active Baker construction sites. Traditional response involves halting work, excavating the soil, manifesting it as hazardous waste, and trucking it away.

  • ✔️
    The Boldwater Fix: Our "Spill Eliminator" microbial packs can be deployed immediately on-site.
  • ✔️
    Zero Downtime: Treat the spill in-place. Light hydrocarbons are decomposed in hours.
  • ✔️
    Cost Avoidance: Avoid emergency hazmat hauling fees and eliminate reportable liability.
🏗️

Site Development & Brownfield Prep

When Baker Construction takes on commercial development projects on previously industrialized land (gas stations, old factories, oilfields), legacy hydrocarbon contamination can halt ground-breaking and destroy budgets.

  • ✔️
    In-Situ Treatment: We remediate contaminated soils in place, or in temporary onsite berms, working alongside your earthwork crews.
  • ✔️
    EPA & State Compliant: Our natural surfactant and BiOWiSH microbes rapidly break down TPH (Total Petroleum Hydrocarbons) to well below regulatory closure limits.
  • ✔️
    Retain Your Dirt: Once clean, the soil remains on your site to be used as structural fill, completely avoiding "dig and haul" replacement costs.
♻️

Circular Economy: TxDOT Grade Materials

Boldwater isn't just a remediation company; we are an EPA and Texas RRC permitted recycler (Permit MR-0024). We turn oilfield and industrial waste into high-strength engineering assets.

  • ✔️
    Certified Road Base: Our remediated materials routinely exceed TxDOT Grade 2 flexible base specifications and compressive strength (≥ 35 psi).
  • ✔️
    Ready for Use: Pre-approved for county roads, drill pads, equipment pads, and commercial subgrades.
  • ✔️
    Supply Chain Edge: Partnering with Boldwater gives Baker access to a localized, highly sustainable, and cost-effective source of engineered base material.

The Boldwater Bio-Remediation Process

Our patented, EPA-recognized technology utilizes specialized all-natural, non-GMO microbiology (powered by BiOWiSH®) to literally consume and safely eliminate hydrocarbons. No hazardous byproducts. No VOCs. Just clean dirt.

🛢️

1. Contamination

Hydrocarbon spill, leak, or existing brownfield soil is identified on site.

🦠

2. Bio-Application

Boldwater's proprietary microbe & nutrient blend is applied directly to the soil.

🔄

3. Aerobic Curing

Mechanical mixing aerates the soil. Microbes rapidly consume the hydrocarbons.

🌱

4. Clean Asset

TPH drops to safe levels. Soil is clean, liability is gone, ready for reuse or backfill.

The Financial Edge:
Proof in the Data

In a recent commercial-scale 13,965 cubic-yard remediation project, our process was benchmarked against the traditional construction approach (Dig, Haul to Landfill, and Replace with new dirt).

Because Boldwater treats the soil in-place and converts it into reusable material, we eliminated over $1.2 Million in trucking, disposal, and replacement costs. The net result was an 82.8% total cost reduction, alongside the complete elimination of long-term environmental liability.

Project Financial Summary

  • Traditional Haul & Dispose Est: $1,219,775
  • Boldwater Total Net Cost: $209,643
  • Total Savings for Client: $1,010,132

Cost Comparison: Traditional vs. Boldwater

Let's Build The Future, Cleanly.

Baker Construction requires fast, compliant, and cost-effective solutions. Boldwater USA has the technology, the permits, and the field experience to deliver. Let's discuss a partnership.

🤝

Mark Knippa

President & CEO, Boldwater USA

Headquarters

11810 Cypress N. Houston Rd, Suite E
Cypress, TX 77429

© 2026 Boldwater Environmental Solutions, LLC. All Rights Reserved.

EPA Recognized • TCEQ Recognized • Texas RRC Permit MR-0024